Skip to content
tube drying cabinet

Tube & Instrument Drying Cabinet

In stock
SMC logo SMC

Introducing the ultimate drying cabinet solution for your facility's needs! This high-quality cabinet measures 900mm wide by 450mm deep by 2050mm high, and is constructed from durable 1.2mm thick stainless steel.

The unit features a top heater unit with controls, including 2 fans, a powerful 2000W Incoloy heater, and a digital controller with an overtemp safety cut-out. A run-down timer and a mains on/off illuminated rocker switch with overtemp warning light provide added convenience, and the cabinet is equipped with a washable filter on top for easy maintenance.

The cabinet is mounted on 4 grey rubber castors with brakes for easy mobility, and comes with a cassette holder on one side and baskets on the other side for storage of your laboratory equipment. The double door design with a glass viewing window allows you to monitor your items as they dry.

Optional extras include full stainless steel baskets (800mm long x 400mm wide x 150mm deep), half stainless steel baskets (400mm long x 400mm wide x 150mm deep),  or tube hanging cassettes with a silicon sheet holding design (capable of holding 49 tubes)

Request pricing and lead times — our sales consultant for your region replies within one business day, with nationwide installation and commissioning by our own technicians.

Common questions

Questions about Tube & Instrument Drying Cabinet

The three questions this unit raises most often. The full FAQ covers ordering, lead times, installation, validation, servicing, spares and guarantees.

Request a Quote
Can I buy spares and accessories?

We stock autoclave spares such as door gaskets and filters, along with spare parts, stainless steel accessories, combined care units and warming cabinets. Every unit we supply is backed by our spares operation and by technicians trained by the equipment manufacturers.

How are service records kept?

One file per asset holds the serial number, service dates, parts fitted, test results, calibration certificates, validation reports and training records.

Do you install and commission the equipment?

Installation and commissioning are part of the quotation, and our own engineers carry them out.